English 한국어
K-Water Guard AI
Daily update: Korea time

Water Quality Dashboard

Latest daily monitoring view for South Korea stations, with readable station locations, summary indicators, maps, and downloadable data.

Open latest CSV
Search filters the alert, province, and station tables below.

Daily Water Intelligence For South Korea

K-WaterGuard AI Agent Overview

K-WaterGuard AI is an autonomous water-quality intelligence dashboard for South Korea. It combines Korean monitoring data, historical station records, spatial maps, alert screening rules, trend analysis, and researcher-ready downloads into one decision-support system.

The agent supports farmers, watershed managers, lake and reservoir operators, researchers, extension officers, policy experts, and environmental agencies by turning raw water-quality records into practical signals for irrigation safety, nutrient pressure, algal-bloom risk, pollution screening, and long-term watershed planning.

The dashboard is organized as an applied AI agent: WQ Evidence & Trends combines corrected station maps, latest status, Mann-Kendall trend statistics, and Sen slope evidence; Algal Bloom Status screens harmful cyanobacteria for national watersheds and Namgang Dam; Hydrometeorological Risk links rainfall, heat, wind, humidity, and ET0 with water-quality pressure; Agrometeorology Prediction evaluates greenhouse, water-curtain cultivation, drought, runoff, and climate-impact sensitivity; Contact & Downloads provides collaboration details and research datasets; and Ask AI helps visitors interpret the live pages.

  • Farmers can review water-quality status before irrigation planning and understand nutrient or algal risk around nearby watersheds.
  • Researchers can download historical station datasets and inspect Mann-Kendall and Sen's slope trend outputs.
  • Water managers can track alerts, spatial hotspots, watershed status, and station coverage with consistent Korean units and standards.

Research Lab And Creator

Created By

This dashboard is created for the Regional Water Environment System Lab, Department of Agricultural Engineering, Gyeongsang National University.

The lab works on water resource conservation, watershed management, agricultural water quality, AI, big-data analytics, remote sensing, and hydrological modeling for sustainable agriculture and evidence-based water policy.

K-WaterGuard AI project page

Latest date
2026-08-24
Last update
2026-08-24 10:53 KST
Stations
2,143
Records
5,000
Cities / Provinces
135 / 16
Alert Stations
729

Farm Decisions

Review water-quality status, nutrient pressure, and algal risk signals before irrigation and agricultural water planning.

Research Trends

Use Mann-Kendall, Sen's slope, annual plots, and downloadable station datasets for long-term water-quality analysis.

Watershed Alerts

Screen Korean water-quality standards, latest monitoring alerts, province coverage, and watershed-level algal bloom status.

Spatial Evidence

Inspect one-point-per-station spatial maps with corrected station identity and coolwarm parameter visualization.

Hydrometeorology

Track rainfall, temperature, wind, humidity, and evapotranspiration signals that influence runoff and bloom pressure.

Water Quality Indicators

pH
7.03
Average
OK
Filter alerts
DO
7.77
Average mg/L
OK
Filter alerts
BOD
2.00
Average mg/L
OK
Filter alerts
COD
3.30
Average mg/L
OK
Filter alerts
SS
10.30
Average mg/L
OK
Filter alerts
TN
1.82
Average mg/L
729 alerts
Filter alerts
TP
0.14
Average mg/L
482 alerts
Filter alerts
temperature
15.61
Average deg C
OK
Filter alerts

Alert Summary

Critical
0
Attention
1,693
Standard ParameterDashboard Rule
pH6.5-8.5
DO>= 5 mg/L
BOD<= 3 mg/L
COD<= 5 mg/L
SS<= 25 mg/L
TN<= 1.5 mg/L
TP<= 0.1 mg/L
Fecal Coliform<= 1000 MPN/100mL
E coli<= 500 MPN/100mL
Ammonia N<= 0.5 mg/L
Nitrate N<= 10 mg/L
Phosphate P<= 0.1 mg/L
Turbidity<= 5 NTU
Chlorophyll a<= 35 ug/L

Contact And Collaborate

K-Water Guard AI Agent is developed for collaborative research, field deployment, and practical water-management decision support. This page explains the project objectives, collaboration goals, and contact pathway for researchers, agencies, watershed managers, farmers, and technology partners.

Mobile And Tablet Application

Install K-WaterGuard AI As A Mobile App

This dashboard is prepared as a Progressive Web App. After installation, it opens from the phone or tablet home screen, keeps the app navigation, caches the dashboard shell, and feels closer to a regular mobile application.

  1. Android / Chrome / Edge: tap Install Mobile App and confirm the browser install prompt.
  2. iPhone / iPad Safari: tap Share, then choose Add to Home Screen.
  3. After installation, open K-WaterGuard AI from the device home screen for the best mobile layout.

01

Objectives

Build an automated national dashboard that converts Korean water-quality, cyanobacteria, spatial, weather, and historical records into clear daily intelligence for water managers and researchers.

02

Research Goals

Support trend detection, algal-bloom screening, irrigation-risk interpretation, watershed comparison, and reproducible environmental data products for scientific analysis.

03

Collaboration Goals

Invite partnerships for field validation, API integration, watershed modeling, farmer decision tools, remote sensing, HSPF scenario analysis, and smart water-management deployment.

Regional Water Environment System Lab

Location
Room 101, Department of Agricultural Engineering, Building 456, 501 Jinju-daero, Jinju-si, Gyeongsangnam-do, Korea
Affiliation
Regional Water Environment System Lab
Project Name
K-Water Guard AI Agent
Research Field
Water Quality Monitoring, Environmental Data Automation, Smart Water Management

Project Team

Developed by
Dr. Muhammad Waqas and Mr. Sangbin Ha
Idea by
Prof. Sang Min Kim
Telephone
055-772-1930
Fax
055-772-1939

Historical Data Downloads

The downloaded NIER historical archive contains 676,393 measurements and 2,143 unique stations from 1989 to 2026.

Download derived annual historical dataset   Download station metadata

Run TimeDateRecordsFile
2026-08-24 10:53:24 KST2026-08-245,000Download CSV
2026-08-23 10:55:39 KST2026-08-235,000Download CSV
2026-08-22 10:45:39 KST2026-08-225,000Download CSV
2026-08-19 10:48:22 KST2026-08-195,000Download CSV
2026-08-17 10:51:35 KST2026-08-175,000Download CSV
2026-08-15 10:45:47 KST2026-08-155,000Download CSV
2026-08-14 17:26:21 KST2026-08-145,000Download CSV
2026-08-14 16:28:15 KST2026-08-145,000Download CSV
2026-08-14 11:37:27 KST2026-08-145,000Download CSV
2026-08-13 14:23:16 KST2026-08-135,001Download CSV
2026-08-13 11:39:47 KST2026-08-131Download CSV
2026-08-12 11:37:40 KST2026-08-121Download CSV
2026-08-11 11:22:16 KST2026-08-115,000Download CSV
2026-08-10 11:29:21 KST2026-08-101Download CSV
2026-08-09 11:23:52 KST2026-08-095,000Download CSV
2026-08-08 11:11:46 KST2026-08-085,000Download CSV
2026-08-07 12:13:38 KST2026-08-071Download CSV
2026-08-06 12:30:18 KST2026-08-061Download CSV
2026-08-05 12:26:07 KST2026-08-051Download CSV
2026-08-04 12:32:08 KST2026-08-041Download CSV
2026-08-03 12:47:43 KST2026-08-031Download CSV
2026-08-02 13:18:06 KST2026-08-025,000Download CSV
2026-08-02 12:59:43 KST2026-08-025,000Download CSV
2026-08-02 12:44:20 KST2026-08-025,000Download CSV
2026-08-02 12:17:12 KST2026-08-025,000Download CSV
2026-08-02 11:57:02 KST2026-08-025,000Download CSV
2026-08-01 19:13:31 KST2026-08-015,000Download CSV
2026-08-01 18:25:02 KST2026-08-011Download CSV
2026-08-01 17:19:53 KST2026-08-015,000Download CSV
2026-08-01 16:35:56 KST2026-08-015,000Download CSV

Historical Dataset By Station And Variable

Use the search box above to filter by station code, station name, province, watershed, or variable. The full CSV links above provide every historical record.

Station CodeStationProvinceWatershedRecordsVariables Available
1001A35Odaecheon1Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1001A30JoyanggangGangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1001A05Songcheon1Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1001A25Goljicheon2Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1001A20BeoncheonGangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1001A15Goljicheon1Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2101A50Hyeongsangang2Gyeongsangbuk-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2101B10Bomunho2Gyeongsangbuk-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2101B20Bomunho1Gyeongsangbuk-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2101B30AngyedamGyeongsangbuk-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2022A25Yangsancheon3Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2022A30GeumgokGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2022A35GupoGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2022A45Seonakdonggang2Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2022A50Seonakdonggang3Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2022B10Nakdongganghagu3BusanNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2022B20Nakdongganghagu2BusanNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2022A10MulgeumGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2022A15Yangsancheon1Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2022A20Yangsancheon2Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2022B30Nakdongganghagu1Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2022F05DaecheoncheonGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2022F10DeokcheoncheonBusanNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2022F50Sineocheon1Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2022A40Seonakdonggang1Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5006B10Yeongsanho3Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5007B10Yeongsanho2Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5006A10Hampyeongcheon1Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5006A20Hampyeongcheon2Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5006A35HampyeongJeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5006A40Muan1Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5005A15Gomagwoncheon1Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1004A42EumseongcheonChungcheongbuk-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1004A05Dalcheon1Chungcheongbuk-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1004A10HwayangcheonChungcheongbuk-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1004A15HyangmokdongcheonChungcheongbuk-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5008A10Muan2Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1004A70Dalcheon5Chungcheongbuk-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1004B10Goesandam3Chungcheongbuk-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1004B20Goesandam2Chungcheongbuk-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1004A20SsangcheonChungcheongbuk-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1004A25Dalcheon2Chungcheongbuk-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1004A30Dongjincheon1Chungcheongbuk-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1004A35Dongjincheon2Chungcheongbuk-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1004A40Dalcheon3Chungcheongbuk-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1004A50SeongmundongcheonChungcheongbuk-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1004A55SeongmuncheonChungcheongbuk-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1004A60Dalcheon4Chungcheongbuk-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1004A65YodocheonChungcheongbuk-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1004A67ChungjucheonChungcheongbuk-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5002A10Hwangnyonggang1Jeollabuk-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5002A20Hwangnyonggang2Jeollabuk-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5002A30Hwangnyonggang3Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5002B10Jangseongdam2Jeollabuk-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5001B10Damyangdam2GwangjuYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5001B20Damyangdam1GwangjuYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5001B30Gwangjudam2GwangjuYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5003B20Najudam1Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5003A10Jiseokcheon1Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5003A20HwasuncheonJeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5003A30Jiseokcheon2GwangjuYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5002B20Jangseongdam1Jeollabuk-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1005A50Deogeun-riGyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5004A30YeongsanpoJeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5004A10GwangsanJeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5004A20NajuJeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5003B10Najudam2Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5005A20Gomagwoncheon2Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1005A60WonjuGyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1005B10Chungjujojeongjidam2Chungcheongbuk-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1005B20Chungjujojeongjidam1Chungcheongbuk-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1005A20YeongdeokcheonGangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1005A30JungwonChungcheongbuk-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1005A40AngseongcheonGyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1006A15Gyecheon1Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1006A20DaegwandaecheonGangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1006A25Gyecheon2Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5001A10DamyangGwangjuYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5001A20UchiGwangjuYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4105B10Sueodam2Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4105B20Sueodam1Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1006A35JeoncheonGangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1006A40Seomgang1Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1006A45Seomgang2Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1006A50Wonjucheon1Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1006A55Wonjucheon2Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1006A05YudongcheonGangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1006A60Seomgang3Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1006A65SeogokcheonGangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1006A70Seomgang4Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1006A30GeumgyecheonGangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5001B40Gwangjudam1GwangjuYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5001A30PungyeongjeongcheonGwangjuYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5001A40Gwangju1GwangjuYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5001A50Gwangjucheon1GwangjuYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5001A60Gwangjucheon2GwangjuYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
5001A70Gwangju2GwangjuYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2201A15BansongGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2201A18DaeamUlsanNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2201A21BoeuncheonGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2201A24HajamgyoGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2201A27JakdonggyoGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2201A33Daegokcheon2UlsanNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2201A36MangseongUlsanNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2201A39GuyeongUlsanNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2201A45TaehwaUlsanNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2101E20CGumucheonGyeongsangbuk-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L)
2201A57DongcheonUlsanNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2201A63MyeongchonUlsanNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2201B10Daeamdam2Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2201B20Daeamdam1UlsanNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2021B20Unmundam1Gyeongsangbuk-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2021A40Miryanggang1Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2021A50Miryanggang2Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2021A60Miryanggang3Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4104B10Juamjojeongjidam3Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4104B20Juamjojeongjidam1Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4104A10Isacheon1Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4104A20Isacheon2Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4104A30Suncheondongcheon1Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1007A05Cheongmicheon1Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1007A10Cheongmicheon2Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4104A40Suncheondongcheon2Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1007A65Heukcheon1Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1007A40Yeoju2Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1007A42YanghwacheonGyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1007A46Bokacheon1Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1007A50Bokacheon2Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1007A15Cheongmicheon3Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1007A20GangcheonGyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1007A25Yeoju1Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4105A10SueocheonJeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4105A20GwangyangseocheonJeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1007A55Bokacheon3Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1007A60IpoGyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1007B20Paldangdam3Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1007A70Heukcheon2Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1007A75GangsangGyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1007B10Paldangdam1Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1010A30HwacheoncheonGangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1009A10HwacheonGangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1010A10YangguseocheonGangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2301A10DeokgyecheonGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2201B30Sayeondam2UlsanNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2201B40Sayeondam1UlsanNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2021B10Unmundam2DaeguNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2301E71CIjillisuroUlsanNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L)
2301A20Hoeyagang1Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2301A30Hoeyagang2Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2301A40Hoeyagang3UlsanNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2301B10Hoeyaho2UlsanNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2301B20Hoeyaho1UlsanNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2301B30SeonamdamUlsanNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2020A30Gwangnyeocheon3Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2020A35ImhaejinGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2020A10NamjiGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2020A45HanamGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2020A50HwapocheonGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2020A60SamnangjinGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2020B10Junam reservoirGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2020A15GyeseongcheonGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2020A20Gwangnyeocheon1Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2020A25Gwangnyeocheon2Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2302F10Suyeonggang2BusanNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2302F15Suyeonggang3BusanNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2302F20Suyeonggang4BusanNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2302F40ChuncheonBusanNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2302A10Hoedongdam SangnyuGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2302F05Suyeonggang1Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2401A10WangpicheonGangwon-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2401A20YeongdeoksongcheonGyeongsangbuk-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2019A20YeongcheongangGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2019A30Namgang2Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2019A40Namgang3Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2019A50UiryeongcheonGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2019A60Hamancheon1Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2402A10YeongdeokGyeongsangbuk-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2019A70Hamancheon2Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2019A75Namgang4Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2019A10Namgang1Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1011A20Inbukcheon2Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1011A30Inbukcheon1Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1010A40ChuncheonGangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1010B10Hwacheondam3Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1010B20Hwacheondam2Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1010B30Hwacheondam1Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1010B40Chuncheondam3Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1010B50Chuncheondam1Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1012A30Soyanggang1Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1012A40Soyanggang2Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1012B10Soyanggangdam4Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1012B20Soyanggangdam5Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1012B30Soyanggangdam3Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1011A10BukcheonGangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1012B40Soyanggangdam1Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1013A10Gongjicheon1Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1013A20Gongjicheon2Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1013A40UiamdamGangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1013A50UiamGangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1012A20Naerincheon2Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4008A10BoseongcheonJeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4007B50Dongbokdam2Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4007B60Dongbokdam1Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4007B70Juamdam1Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1016A80Gyeongancheon6Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1013A90Gapyeongcheon3Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1013B10Uiamdam3Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1013B20Uiamdam2Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1013B30Uiamdam1Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4009A30GuryeJeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4009A40DeogeunJeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4009A50HadongJeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1014A10HwayanggangGangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1014A20Hongcheongang1Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1014A30Hongcheongang2Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1013A60ChunseonggyoGyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1013A70Gapyeongcheon1Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1013A80Gapyeongcheon2Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1010B60Chuncheondam2Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1015A20Jojongcheon1Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1015A25Jojongcheon2Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1015A30Jojongcheon3Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1015A40Daeseong-riGyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2018A50Deokcheongang1Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2018A55Deokcheongang2Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2018A05NamgangcheonJeollabuk-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2018A10Hamyangwicheon1Jeollabuk-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2018A15Hamyangwicheon2Jeollabuk-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2018B10Namgangdam3Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2018B20Namgangdam2Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2018B30Namgangdam1Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2018A35Gyeonghogang1Jeollabuk-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2018A40YangcheonGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2018A45Gyeonghogang2Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2501A40GoseongcheonGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2403A10NaengcheonGyeongsangbuk-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2501A10BaengnyeoncheonGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2501A30SacheoncheonGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4007A10BoseonggangJeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4006A20GokseongJeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4004A20NamwonJeollabuk-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1015B10Cheongpyeongdam3Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1015B20Cheongpyeongdam2Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4007A30Dongbokcheon1Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4007A35Dongbokcheon2Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4007B10Boseonggangdam1Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4007B20Boseonggangdam2Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4007B30Juamdam3Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4007B40Juamdam2Jeollanam-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1016A70Gyeongancheon5Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1015B30Cheongpyeongdam1Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1015B40Paldangdam4Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1016A20Gyeongancheon1Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1016A30Gyeongancheon2Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1016A40Gyeongancheon3Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1015A50MukyeoncheonGyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1015A60Sambong-riGyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1016B10Paldangdam5Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1017A10PaldangdamGyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1017B10Paldangdam2Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1018A04SeongnaecheonGyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1018A06Tancheon1Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1016A50Gyeongancheon4Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1016A60GonjiamcheonGyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4002A20ImsilJeollabuk-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4001A10GwanchonJeollabuk-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4001A30UnamJeollabuk-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4001B10Seomjingangdam3Jeollabuk-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4001B20Seomjingangdam2Jeollabuk-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4001B30Seomjingangdam1Jeollabuk-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1021A10Imjingang1Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1018A14Tancheon3Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1018A16Tancheon4Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1018A20YangjaecheonGyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1018A22Tancheon5Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1018A24TtukdoSeoulHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4003A10OsucheonJeollabuk-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4004A10JeokseongJeollabuk-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1018A52NoryangjinSeoulHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1018A54YeongdeungpoGyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1018A56HongjecheonSeoulHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1018A28Jungnangcheon1Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1018A32Jungnangcheon2Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1018A36Jungnangcheon3Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1018A42JeongneungcheonSeoulHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1018A12Tancheon2Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
4005A10YocheonJeollabuk-doYeongsan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1018A60Anyangcheon1Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1018A70Anyangcheon2Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1018A72Anyangcheon3Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1018A76MokgamcheonGyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1018A48Jungnangcheon4SeoulHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1018A50BogwangSeoulHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2015A30Geochangwicheon1Jeollabuk-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2015A40Geochangwicheon2Jeollabuk-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2015A50Hwanggang1Jeollabuk-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2015A70GacheonGyeongsangbuk-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2015B10Hapcheondam3Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2016A10Hwanggang2Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2016A20Hwanggang3Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2015B20Hapcheondam2Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2015B30Hapcheondam1Gyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2017A10HapcheonGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2503A10YeonchocheonGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2503A30GucheoncheonGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2503B30GucheondamGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
3303A10BaekcheonnaeJeollabuk-doGeum River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
3303B10Buandam3Jeollabuk-doGeum River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
3303B20Buandam2Jeollabuk-doGeum River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
3303B30Buandam1Jeollabuk-doGeum River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1019A05GayangGyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1019A10Changneungcheon1Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1019A20Changneungcheon3Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1019A25HaengjuGyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1019A30GimpoGyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1019A35Gulpocheon1Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1019A40Gulpocheon2Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1018A82Anyangcheon4Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1018A84DorimcheonGyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1018A86Anyangcheon5Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1022A05GimhwanamdaecheonGangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1022A10Hantangang1Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1022A20Yeongpyeongcheon1Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1019A50Gongneungcheon1Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1019A55Gongneungcheon2Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1019A60Gongneungcheon3Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1019A15Changneungcheon2Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1022A50Sincheon2Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
3302A35Jeongeupcheon4Jeollabuk-doGeum River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
3302A45Gobucheon1Jeollabuk-doGeum River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
3302A50Gobucheon2Jeollabuk-doGeum River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
3302A55Wonpyeongcheon1Jeollabuk-doGeum River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
3302A60Wonpyeongcheon2Jeollabuk-doGeum River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
3301F40Jeonjucheon4Jeollabuk-doGeum River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1022A55Sincheon3Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1022A65ChatancheonGyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1022A25Yeongpyeongcheon2Gangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1022A30PocheoncheonGangwon-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1022A35Yeongpyeongcheon3Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1022A37Hantangang2Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1022A40Hantangang3Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
1022A45Sincheon1Gyeonggi-doHan River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
3003A10MujunamdaecheonChungcheongbuk-doGeum River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2504A20NaedongcheonGyeongsangnam-doNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
3004A60Yeongdongcheon1Chungcheongbuk-doGeum River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
3004A70Yeongdongcheon2Chungcheongbuk-doGeum River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
3004A20JewonChungcheongnam-doGeum River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
3004A30BonghwangcheonChungcheongnam-doGeum River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
3002A50YongpoChungcheongnam-doGeum River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)
2014A10HwawonnaruDaeguNakdong River30DO (mg/L), BOD (mg/L), COD (mg/L), TN (mg/L), TP (mg/L), TOC (mg/L), Chlorophyll a (mg/m3)

Algal Bloom Status In Korean Watersheds And Lakes

Korean Caution
1,000 cells/mL
Korean Warning
10,000 cells/mL
Bloom Outbreak
1,000,000 cells/mL

Korean algae alerts use harmful cyanobacteria cell counts in cells/mL. This page keeps a persistent national history from the NIER algae-warning feed for all available Korean watersheds and keeps Namgang Dam / Jinyang Lake as a separate local focus area.

Download national NIER cyanobacteria feed   Download local station cyanobacteria archive   Download local lakewide archive

Section 1 - All Korean Watersheds

National watershed status is based on harmful cyanobacteria cell-count observations where available. Daily runs append new NIER records to the local historical archive so previous watersheds remain visible when the live feed changes.

Cyanobacteria Watershed Spatial Map

Cyanobacteria Watershed Spatial Map
Image file not found. Check the matching file in the plots folder.

Watershed Cyanobacteria Screening

Watershed Cyanobacteria Screening
Image file not found. Check the matching file in the plots folder.

Annual Cyanobacteria Signal By Watershed

Annual Cyanobacteria Signal By Watershed
Image file not found. Check the matching file in the plots folder.

National Current / Historical Alerts

StatusDateStationWatershedValueUnitBasis
Warning2026-08-202011G56 - 2011G56Nakdonggang489,500cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-182011G56 - 2011G56Nakdonggang483,021cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-032022G20 - 2022G20Nakdonggang184,781cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-102020G33 - 2020G33Nakdonggang183,037cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-032022G10 - 2022G10Nakdonggang105,220cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-182022G10 - 2022G10Nakdonggang100,194cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-042009G10 - 2009G10Nakdonggang94,620cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-07-272022G10 - 2022G10Nakdonggang74,161cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-192022G05 - 2022G05Nakdonggang70,575cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-132011G26 - 2011G26Nakdonggang69,420cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-102022G10 - 2022G10Nakdonggang65,605cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-112011G10 - 2011G10Nakdonggang63,400cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-203008G30 - 3008G30Daecheongho62,440cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-182022G20 - 2022G20Nakdonggang61,526cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-132022G05 - 2022G05Nakdonggang55,171cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-182011G10 - 2011G10Nakdonggang53,460cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-132011G56 - 2011G56Nakdonggang49,400cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-182011G26 - 2011G26Nakdonggang48,840cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-112009G10 - 2009G10Nakdonggang44,700cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-102022G20 - 2022G20Nakdonggang44,471cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-212022G05 - 2022G05Nakdonggang40,200cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-07-272022G20 - 2022G20Nakdonggang40,182cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-202011G26 - 2011G26Nakdonggang36,360cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-183008G30 - 3008G30Daecheongho34,742cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-133008G30 - 3008G30Daecheongho34,349cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-183014G20 - 3014G20G02629,128cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-07-132022G20 - 2022G20Nakdonggang25,092cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-07-233008G30 - 3008G30Daecheongho23,011cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-07-132022G10 - 2022G10Nakdonggang22,111cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-212020G33 - 2020G33Nakdonggang20,463cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-07-273008G30 - 3008G30Daecheongho19,988cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-181018G08 - 1018G08Hangang19,700cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-182012G56 - 2012G56Gongsanji17,555cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-07-203008G30 - 3008G30Daecheongho13,889cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-183014G10 - 3014G10G02613,640cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-181018G10 - 1018G10Hangang13,640cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-202020G33 - 2020G33Nakdonggang12,280cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-182009G10 - 2009G10Nakdonggang11,400cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Warning2026-08-182012G55 - 2012G55Gongsanji11,165cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-033014G20 - 3014G20G0269,845cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-102012G56 - 2012G56Gongsanji9,700cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-102012G55 - 2012G55Gongsanji9,300cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-07-272012G56 - 2012G56Gongsanji8,980cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-07-272012G55 - 2012G55Gongsanji8,460cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-07-272011G56 - 2011G56Nakdonggang8,457cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-07-282011G10 - 2011G10Nakdonggang8,440cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-07-282009G10 - 2009G10Nakdonggang7,100cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-183008G40 - 3008G40Daecheongho6,690cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-032012G55 - 2012G55Gongsanji6,425cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-07-202022G05 - 2022G05Nakdonggang6,213cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-183008G50 - 3008G50Daecheongho6,014cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-07-202022G20 - 2022G20Nakdonggang5,915cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-07-202022G10 - 2022G10Nakdonggang5,596cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-032012G56 - 2012G56Gongsanji5,240cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-07-272022G05 - 2022G05Nakdonggang4,946cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-07-272020G33 - 2020G33Nakdonggang4,618cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-123014G10 - 3014G10G0264,543cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-103008G40 - 3008G40Daecheongho4,354cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-033008G50 - 3008G50Daecheongho4,272cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-103014G20 - 3014G20G0264,191cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-103008G50 - 3008G50Daecheongho4,044cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-031006G30 - 1006G30Hoengseongho3,371cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-033008G40 - 3008G40Daecheongho3,310cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-032301G20 - 2301G20Hoeyaho3,230cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-07-212011G10 - 2011G10Nakdonggang3,120cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-07-272011G26 - 2011G26Nakdonggang2,988cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-07-273008G50 - 3008G50Daecheongho2,861cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-181018G09 - 1018G09Hangang2,830cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-182301G20 - 2301G20Hoeyaho2,740cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-183203G20 - 3203G20Boryeongho2,548cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-182301G10 - 2301G10Hoeyaho2,460cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-032301G10 - 2301G10Hoeyaho2,430cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-043014G10 - 3014G10G0262,365cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-042011G10 - 2011G10Nakdonggang2,296cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-101018G07 - 1018G07Hangang2,219cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-102301G20 - 2301G20Hoeyaho2,080cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-07-202012G55 - 2012G55Gongsanji2,005cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-031018G07 - 1018G07Hangang1,967cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-08-101018G09 - 1018G09Hangang1,933cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count
Caution2026-07-212009G10 - 2009G10Nakdonggang1,880cells/mLNIER mobile algae-warning recent measurement: harmful cyanobacteria cell count

All-Watershed Status

Watershed / BasinStationsMax CyanobacteriaStatus
Nakdonggang8489,500 cells/mLWarning
Daecheongho362,440 cells/mLWarning
G026329,128 cells/mLWarning
Hangang1019,700 cells/mLWarning
Gongsanji217,555 cells/mLWarning
Hoengseongho13,371 cells/mLCaution
Hoeyaho23,230 cells/mLCaution
Boryeongho12,548 cells/mLCaution
Sayeonho21,850 cells/mLCaution
Jinyangho21,250 cells/mLCaution
Gwanggyoji1987 cells/mLNormal
Chungjuho2965 cells/mLNormal
Paldangho3904 cells/mLNormal
Yeongcheonho1828 cells/mLNormal
Okjeongho2693 cells/mLNormal
Tamjinho2468 cells/mLNormal
Yongdamho2455 cells/mLNormal
Angyeho1416 cells/mLNormal
Dongboko2400 cells/mLNormal
Juamho2361 cells/mLNormal
Uiamho1297 cells/mLNormal
Jinjeonji2288 cells/mLNormal
Chuncheonho2284 cells/mLNormal
Unmunho2190 cells/mLNormal
Deokdongho1103 cells/mLNormal

Section 2 - Namgang Dam / Jinyang Lake Focus

This focus section uses the local Namgang Dam and Jinyang Lake cyanobacteria archive, kept separate from the national watershed feed so local lake records do not replace the national all-watershed view.

Namgang Historical Alerts

StatusDateStationWatershedValueUnitBasis
Warning2017-12-04CYANO_NAEDONG - NaedongNamgang Dam58,463cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2017-11-27CYANO_LAKE_MAX - Lake maxNamgang Dam58,463cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2017-11-08CYANO_LAKE_MAX - Lake maxNamgang Dam54,230cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2017-11-08CYANO_NAEDONG - NaedongNamgang Dam54,230cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2017-11-06CYANO_NAEDONG - NaedongNamgang Dam50,218cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2017-11-06CYANO_LAKE_MAX - Lake maxNamgang Dam50,218cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2017-11-30CYANO_NAEDONG - NaedongNamgang Dam48,960cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2017-11-22CYANO_LAKE_MEAN - Lake meanNamgang Dam48,960cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2017-11-22CYANO_LAKE_MAX - Lake maxNamgang Dam48,960cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2017-11-27CYANO_NAEDONG - NaedongNamgang Dam39,831cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2017-11-20CYANO_LAKE_MAX - Lake maxNamgang Dam39,831cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2017-11-27CYANO_LAKE_MEAN - Lake meanNamgang Dam36,014cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2017-11-06CYANO_LAKE_MEAN - Lake meanNamgang Dam34,204cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2017-10-30CYANO_NAEDONG - NaedongNamgang Dam33,609cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2017-10-30CYANO_LAKE_MAX - Lake maxNamgang Dam33,609cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2018-08-16CYANO_LAKE_MAX - Lake maxNamgang Dam32,009cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2018-08-16CYANO_LAKE_MEAN - Lake meanNamgang Dam32,009cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2018-08-16CYANO_PANMUN - PanmunNamgang Dam32,009cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2017-11-08CYANO_LAKE_MEAN - Lake meanNamgang Dam30,864cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2017-11-20CYANO_LAKE_MEAN - Lake meanNamgang Dam30,770cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2017-10-30CYANO_LAKE_MEAN - Lake meanNamgang Dam30,370cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2018-08-14CYANO_LAKE_MAX - Lake maxNamgang Dam28,784cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2018-08-14CYANO_PANMUN - PanmunNamgang Dam28,784cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2018-08-06CYANO_PANMUN - PanmunNamgang Dam28,563cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2018-08-06CYANO_LAKE_MAX - Lake maxNamgang Dam28,563cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2017-10-30CYANO_PANMUN - PanmunNamgang Dam27,132cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2017-12-13CYANO_NAEDONG - NaedongNamgang Dam26,231cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2017-12-06CYANO_LAKE_MAX - Lake maxNamgang Dam26,231cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2017-11-13CYANO_LAKE_MAX - Lake maxNamgang Dam25,840cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2017-11-13CYANO_NAEDONG - NaedongNamgang Dam25,840cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2017-11-20CYANO_NAEDONG - NaedongNamgang Dam24,565cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2017-11-16CYANO_LAKE_MEAN - Lake meanNamgang Dam24,565cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2017-11-16CYANO_LAKE_MAX - Lake maxNamgang Dam24,565cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2017-10-24CYANO_NAEDONG - NaedongNamgang Dam23,579cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2017-10-24CYANO_LAKE_MAX - Lake maxNamgang Dam23,579cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2017-11-20CYANO_PANMUN - PanmunNamgang Dam21,709cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2017-10-24CYANO_LAKE_MEAN - Lake meanNamgang Dam21,607cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2015-08-24CYANO_PANMUN - PanmunNamgang Dam20,425cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2015-08-24CYANO_LAKE_MAX - Lake maxNamgang Dam20,425cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2017-12-06CYANO_LAKE_MEAN - Lake meanNamgang Dam19,644cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2017-10-24CYANO_PANMUN - PanmunNamgang Dam19,635cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2017-11-06CYANO_PANMUN - PanmunNamgang Dam18,190cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2017-11-13CYANO_LAKE_MEAN - Lake meanNamgang Dam17,765cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2018-08-20CYANO_LAKE_MAX - Lake maxNamgang Dam16,727cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2018-08-20CYANO_PANMUN - PanmunNamgang Dam16,727cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2018-08-14CYANO_LAKE_MEAN - Lake meanNamgang Dam15,517cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2017-12-11CYANO_NAEDONG - NaedongNamgang Dam14,977cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2017-12-04CYANO_LAKE_MAX - Lake maxNamgang Dam14,977cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2018-08-06CYANO_LAKE_MEAN - Lake meanNamgang Dam14,690cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2015-08-24CYANO_LAKE_MEAN - Lake meanNamgang Dam14,050cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2021-10-12CYANO_LAKE_MAX - Lake maxNamgang Dam13,985cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2021-10-12CYANO_PANMUN - PanmunNamgang Dam13,985cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2017-11-27CYANO_PANMUN - PanmunNamgang Dam13,566cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2017-12-06CYANO_PANMUN - PanmunNamgang Dam13,056cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2017-12-06CYANO_NAEDONG - NaedongNamgang Dam12,818cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2017-11-30CYANO_LAKE_MAX - Lake maxNamgang Dam12,818cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2019-09-09CYANO_LAKE_MAX - Lake maxNamgang Dam12,054cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2019-09-09CYANO_PANMUN - PanmunNamgang Dam12,054cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2017-11-30CYANO_LAKE_MEAN - Lake meanNamgang Dam11,900cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2017-12-04CYANO_LAKE_MEAN - Lake meanNamgang Dam11,237cells/mLLakewide harmful cyanobacteria cell-count summary
Warning2017-11-30CYANO_PANMUN - PanmunNamgang Dam10,982cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Warning2021-10-12CYANO_LAKE_MEAN - Lake meanNamgang Dam10,582cells/mLLakewide harmful cyanobacteria cell-count summary
Caution2021-09-28CYANO_LAKE_MAX - Lake maxNamgang Dam9,755cells/mLLakewide harmful cyanobacteria cell-count summary
Caution2021-09-23CYANO_NAEDONG - NaedongNamgang Dam9,755cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Caution2017-11-13CYANO_PANMUN - PanmunNamgang Dam9,690cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Caution2021-09-23CYANO_LAKE_MAX - Lake maxNamgang Dam9,533cells/mLLakewide harmful cyanobacteria cell-count summary
Caution2021-09-23CYANO_PANMUN - PanmunNamgang Dam9,533cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Caution2021-09-23CYANO_LAKE_MEAN - Lake meanNamgang Dam9,458cells/mLLakewide harmful cyanobacteria cell-count summary
Caution2021-10-18CYANO_LAKE_MAX - Lake maxNamgang Dam9,425cells/mLLakewide harmful cyanobacteria cell-count summary
Caution2021-10-18CYANO_PANMUN - PanmunNamgang Dam9,425cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Caution2021-09-13CYANO_NAEDONG - NaedongNamgang Dam9,382cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Caution2017-07-31CYANO_LAKE_MAX - Lake maxNamgang Dam9,078cells/mLLakewide harmful cyanobacteria cell-count summary
Caution2017-07-31CYANO_PANMUN - PanmunNamgang Dam9,078cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Caution2017-12-19CYANO_NAEDONG - NaedongNamgang Dam8,942cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Caution2017-12-11CYANO_LAKE_MAX - Lake maxNamgang Dam8,942cells/mLLakewide harmful cyanobacteria cell-count summary
Caution2021-10-05CYANO_LAKE_MAX - Lake maxNamgang Dam8,878cells/mLLakewide harmful cyanobacteria cell-count summary
Caution2021-09-28CYANO_NAEDONG - NaedongNamgang Dam8,878cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Caution2018-08-20CYANO_LAKE_MEAN - Lake meanNamgang Dam8,846cells/mLLakewide harmful cyanobacteria cell-count summary
Caution2017-10-17CYANO_PANMUN - PanmunNamgang Dam8,364cells/mLMeasured harmful cyanobacteria cell count from local algae monitoring support data
Caution2017-10-17CYANO_LAKE_MAX - Lake maxNamgang Dam8,364cells/mLLakewide harmful cyanobacteria cell-count summary

Namgang Lake Status

Watershed / BasinStationsMax CyanobacteriaStatus
Namgang Dam458,463 cells/mLWarning
RuleCautionWarningBloom OutbreakUnit
Harmful cyanobacteria1,00010,0001,000,000cells/mL

Scenario And HSPF Support Data

SourceScenarioMean Chlorophyll-aP90/P95Threshold ExceedanceManagement Note
Observed modelbaseline_observed_conditions4.28 ug/L6.03 ug/L0Current observed monthly conditions.
Observed modeltp_reduction_204.09 ug/L5.67 ug/L0Moderate phosphorus reduction.
Observed modeltp_reduction_403.91 ug/L5.32 ug/L0Strong phosphorus reduction.
Observed modeltn_tp_reduction_403.65 ug/L5.01 ug/L0Combined nitrogen and phosphorus reduction.
Observed modelwarming_plus_2c4.62 ug/L6.47 ug/L0Climate warming sensitivity.
Observed modelwarming_plus_2c_tp_reduction_404.22 ug/L5.72 ug/L0Nutrient management under warmer water.
HSPF PLNK 2010baseline5.26 ug/L21.64 ug/L362010 calibrated PLNK baseline using observed monthly WQ boundary loads
HSPF PLNK 2010tnp404.74 ug/L21.34 ug/L21HSPF PLNK scenario with 40% TN/NO3/NH3 and TP/PO4 load reduction
HSPF PLNK 2010tp204.88 ug/L21.43 ug/L24HSPF PLNK scenario with 20% TP/PO4 load reduction

Hydrometeorological Risk Outlook

Rainfall Watch
>= 25 mm/day
Runoff Pressure
>= 50 mm/day
Heat Stress
>= 33 deg C

This scientific weather page uses basin-scale daily meteorological data to support water-quality interpretation. Rainfall, temperature, humidity, wind, and reference evapotranspiration are screened as drivers of runoff, dilution, irrigation pressure, and algal-bloom development.

Fourteen-Day Rainfall Risk Ranking With Thresholds

Fourteen-Day Rainfall Risk Ranking With Thresholds
Image file not found. Check the matching file in the plots folder.

Temperature Envelope And Heat-Stress Screen

Temperature Envelope And Heat-Stress Screen
Image file not found. Check the matching file in the plots folder.

Basin Hydrometeorological Risk Matrix

Basin Hydrometeorological Risk Matrix
Image file not found. Check the matching file in the plots folder.

Rainfall-Heat-Wind Compound Risk Space

Rainfall-Heat-Wind Compound Risk Space
Image file not found. Check the matching file in the plots folder.

Basin Water-Balance Stress Proxy

Basin Water-Balance Stress Proxy
Image file not found. Check the matching file in the plots folder.

Latest Basin Weather Signals

BasinDateRainfallTemperatureHumidityWindET0Signal
Geum River2026-08-3012.0 mm23.4-29.1 deg C91%11.3 km/h3.1 mmNormal
Han River2026-08-3012.2 mm20.1-25.5 deg C91%7.9 km/h1.8 mmNormal
Nakdong River2026-08-307.5 mm23.8-27.0 deg C94%6.7 km/h1.9 mmNormal
Namgang Dam2026-08-3018.0 mm24.2-29.0 deg C93%10.3 km/h2.5 mmNormal
Yeongsan / Seomjin River2026-08-3038.4 mm23.9-26.8 deg C96%11.8 km/h2.1 mmRainfall watch

Fourteen-Day Basin Summary

BasinRain TotalMax TemperatureMean HumidityStatus
Namgang Dam154.1 mm36.3 deg C88%Runoff pressure
Han River103.5 mm30.3 deg C90%Runoff pressure
Yeongsan / Seomjin River87.8 mm33.8 deg C89%Rainfall watch
Nakdong River62.4 mm35.1 deg C86%Rainfall watch
Geum River48.3 mm33.3 deg C86%Normal

Agrometeorology Prediction And Climate Impact Outlook

Model
K-WaterGuard AgroClimate
High-risk basins
2
Top driver
Extreme runoff

The K-WaterGuard AgroClimate Prediction Model is a transparent hybrid screening model that combines basin-scale daily meteorology, recent water-quality nutrient pressure, cyanobacteria context, evapotranspiration demand, heat-stress thresholds, and scenario sensitivity rules. The purpose is not to replace official agricultural or meteorological forecasts, but to convert the daily water-environment archive into an interpretable early-warning layer for irrigation reliability, drought tendency, runoff-driven contamination risk, bloom-agriculture coupling, and climate-change stress screening.

01

Agriculture Water Stress

The agriculture-water-stress score ranks each basin using the number of dry days in the latest 14-day window, reference evapotranspiration, maximum temperature, and crop heat-stress exposure. Higher scores indicate basins where irrigation demand may rise faster than natural rainfall replenishment, especially when warm conditions increase ET0 and reduce soil-water persistence. This layer is useful for farmers, watershed managers, and extension experts who need a basin-scale view of potential crop water stress before field-level decisions are made.

02

Drought And Extreme Events

The model separates two different hazards that are often mixed together: hot-dry drought pressure and rainfall-runoff extreme-event pressure. Drought pressure is derived from dry-day frequency, ET0, and heat load; runoff pressure is derived from 14-day accumulated rainfall and wind-related storm intensity. Showing both dimensions allows managers to distinguish basins that need irrigation planning from basins where sudden runoff, sediment transport, nutrient flushing, or post-storm water-quality deterioration may be more important.

03

Future Impact Lens

The future-impact lens applies two transparent sensitivity experiments: a +2 deg C hot-dry stress scenario and an extreme-rainfall amplification scenario. These are not deterministic climate forecasts; they are screening perturbations that show how the current basin condition may respond if near-term climate stress intensifies. The results help identify basins where small increases in heat, dry spells, or rainfall intensity could shift agricultural water reliability, cyanobacteria risk, and runoff-driven pollutant delivery.

M1

Model Inputs

Daily basin weather records provide rainfall, temperature, humidity, wind, and ET0. Water-quality records provide nutrient pressure through TN and TP. Cyanobacteria records provide bloom-agriculture context where cell-count data are available. All indicators are normalized to a 0-1 screening scale for transparent comparison.

M2

Academic Interpretation

The prediction index is a weighted composite of drought stress, heat stress, runoff pressure, bloom-agriculture pressure, and climate-shift sensitivity. It should be interpreted as a relative basin-priority index for monitoring and planning, not as a calibrated probability of crop loss or an official disaster warning.

M3

Geospatial Decision Layer

The clickable map places the model output back into watershed space. Marker size and color show the integrated prediction index, while hover details expose the individual drivers so users can see whether a basin is controlled mainly by water stress, heat, runoff, or bloom-agriculture coupling.

A1

Greenhouse Agriculture Exposure

South Korea's protected horticulture and greenhouse agriculture depend on stable irrigation water, controlled thermal conditions, and reliable local water sources. When hot days, high ET0, and dry spells occur together, crop water demand and cooling demand can rise while streamflow, reservoir dilution, and shallow groundwater recharge may weaken. The model highlights basins where these combined pressures can reduce crop-water reliability, increase irrigation scheduling uncertainty, and intensify water-quality sensitivity for vegetable, fruit, and high-value greenhouse production.

A2

Water-Curtain Cultivation Sensitivity

Water-curtain cultivation is especially sensitive because winter greenhouse heating depends on continuous water circulation and dependable groundwater or surface-water supply. A prolonged dry period can lower recharge and increase competition between irrigation, greenhouse heating, and ecological flow needs. Warmer winters may reduce heating demand in some periods, but unstable recharge, groundwater temperature changes, and nutrient or microbial contamination can still increase management risk for water-curtain systems.

A3

Drought, Nutrients, And Bloom Coupling

Hot-dry periods can concentrate TN, TP, salts, and organic matter by reducing dilution. If heavy rainfall follows, runoff can rapidly transport nutrients, sediments, and microbial pollutants from agricultural land to streams, reservoirs, and irrigation intakes. This dry-to-wet sequence is important for farmers because it can connect drought stress, bloom risk, post-storm turbidity, and irrigation suitability within the same production season.

A4

Future Agriculture Impact Pathway

The future lens ranks basins where +2 deg C heat sensitivity and extreme-rainfall amplification may affect irrigation demand, greenhouse ventilation, water-curtain reliability, stormwater retention needs, nutrient flushing, and crop disease pressure. Practical adaptation priorities include basin-specific water budgeting, greenhouse irrigation scheduling, groundwater monitoring around water-curtain cultivation clusters, nutrient source control, storm-runoff retention, and linking water-quality alerts with farm advisory systems.

South Korea Vegetation Condition Index And Agricultural Drought Analysis

This live agrometeorology layer evaluates agricultural drought and vegetation stress across South Korea using the Vegetation Condition Index (VCI) concept. The workflow is designed to accept satellite-based NDVI products from Google Earth Engine, MODIS, Sentinel, Landsat, or local CSV exports when they are available. In each daily agent run, the dashboard also creates an operational national VCI screening grid from the live K-WaterGuard basin meteorology, drought, heat, evapotranspiration, runoff, water-quality, and bloom-risk drivers so that the Agrometeorology page remains complete for all Korean watersheds.

VCI compares current vegetation condition with the historical minimum and maximum NDVI range at each location. This is more informative than a simple NDVI map because naturally low-vegetation areas are evaluated against their own historical behavior rather than against a national average. For South Korea, this is important because protected agriculture, greenhouse horticulture, paddy fields, upland crops, mountainous watersheds, reservoir-irrigated areas, and water-curtain cultivation zones respond differently to heat, rainfall deficits, groundwater recharge, and water-quality stress.

VCI

Index Formula

VCI = 100 x (NDVI_current - NDVI_min) / (NDVI_max - NDVI_min). The dashboard uses the 0-100 interpretation scale, where low values indicate vegetation stress or agricultural drought and high values indicate normal to very good vegetation condition.

EO

Satellite Workflow

The satellite-ready workflow builds a historical annual NDVI baseline, estimates pixel-wise NDVI minimum and maximum conditions, calculates the current-year NDVI layer, converts it to VCI, clips the analysis to the South Korea boundary, and publishes clickable national maps for farm and watershed interpretation.

AI

K-WaterGuard Live Layer

When a satellite VCI file is not present, the agent produces a transparent operational VCI proxy from live basin weather and water-environment indicators. This fallback is clearly labeled in the map hover text and is intended as an early-warning screening layer, not an official crop-loss forecast.

VCI RangeClassAgricultural Interpretation
0-10Extreme droughtVery poor vegetation condition; urgent field verification and irrigation-risk review.
10-20Severe droughtStrong vegetation stress; high concern for crop water reliability and protected-agriculture supply.
20-30Moderate droughtClear stress signal; monitor rainfall, ET0, soil moisture, reservoir supply, and water quality.
30-40Mild droughtEarly vegetation stress; useful for preventive irrigation scheduling and farm advisory screening.
40-50Slight vegetation stressBelow-normal vegetation condition; compare with local crop calendar and recent rainfall.
50-60Normal conditionsVegetation close to the historical range for the location.
60-80Good vegetation conditionVegetation condition is favorable relative to the baseline.
80-100Very good vegetation conditionVegetation is substantially better than historical low-stress conditions.

For a full drought early-warning system, VCI should be interpreted with SPI, SPEI, rainfall anomalies, soil moisture, land-surface temperature, TCI, VHI, evapotranspiration, NDVI anomalies, groundwater status, reservoir storage, and irrigation-water-quality alerts. K-WaterGuard AI links the vegetation signal with hydrometeorological and water-quality evidence so users can distinguish meteorological drought, agricultural drought, vegetation stress, temperature stress, runoff contamination risk, and bloom-agriculture coupling.

South Korea VCI Agricultural Drought Screening Map

South Korea VCI Agricultural Drought Screening Map
Image file not found. Check the matching file in the plots folder.

VCI Agricultural Drought Class Distribution

VCI Agricultural Drought Class Distribution
Image file not found. Check the matching file in the plots folder.

Basin Vegetation Stress Ranking From VCI

Basin Vegetation Stress Ranking From VCI
Image file not found. Check the matching file in the plots folder.

NDVI Baseline Envelope And Current Vegetation Position

NDVI Baseline Envelope And Current Vegetation Position
Image file not found. Check the matching file in the plots folder.

K-WaterGuard AgroClimate Prediction Model

K-WaterGuard AgroClimate Prediction Model
Image file not found. Check the matching file in the plots folder.

Drought Versus Extreme-Runoff Risk Space

Drought Versus Extreme-Runoff Risk Space
Image file not found. Check the matching file in the plots folder.

Agriculture Drought And Extreme-Event Scenario Sensitivity

Agriculture Drought And Extreme-Event Scenario Sensitivity
Image file not found. Check the matching file in the plots folder.

Protected Agriculture And Water-Curtain Risk Components

Protected Agriculture And Water-Curtain Risk Components
Image file not found. Check the matching file in the plots folder.

Greenhouse Irrigation And Water-Curtain Reliability Space

Greenhouse Irrigation And Water-Curtain Reliability Space
Image file not found. Check the matching file in the plots folder.

Top Basin Multi-Hazard Agriculture Risk Fingerprints

Top Basin Multi-Hazard Agriculture Risk Fingerprints
Image file not found. Check the matching file in the plots folder.

Agriculture Adaptation Priority Stack By Basin

Agriculture Adaptation Priority Stack By Basin
Image file not found. Check the matching file in the plots folder.

K-WaterGuard AgroClimate Model Basin Ranking

BasinPrediction IndexStatusMain DriverDroughtHeatExtreme RunoffBloom-Agri
Namgang Dam0.66HighExtreme runoff0.490.690.840.66
Nakdong River0.64HighBloom-agriculture0.510.720.590.82
Yeongsan / Seomjin River0.57ModerateExtreme runoff0.480.440.750.68
Geum River0.49ModerateBloom-agriculture0.520.300.440.74
Han River0.42ModerateExtreme runoff0.340.020.790.65
K-Water Guard AI Chat
Ask about latest water quality data
Hello. I am running in free dashboard mode. Ask me about latest date, stations, records, alerts, parameters, or maps.